This item is limited to 3 per household.
- Kuha 112-113 appeared! Large remodeling 113 system Shikoku update car
- The top of the remodeling 113 system, which is assigned from JR East, I am using.
- Paint color is different for each organization, we have a blue first organized a keynote and the paint color.
- Although 111 system from the time of electrification completed by JR Shikoku Takamatsu district had been used, replaced
Study is Shikoku updated car 113 system was renovated in our own factory 113 system that was purchased from JR East
Is. The main modification contents, of exchange and side window Ha sort-stool of change, the outer plate of the gutter shape
Conductor for space installation in the exchange-cab partial structure strengthen and 2 Panta reduction and power exchange and intermediate wheel
And including the installation and installation of lightning-type guide display machine of commercial door will be like. Above all
Conductor for space installation in the intermediate wheel reflects the circumstances of many of the unmanned station Shikoku unique
It is noted as a thing. Paint is different from those of each knitting, the first knitting blue,
Second organization pink, third organization is adopted colorful those based on yellow
Have you. Currently belong to 4-car train three Takamatsu operation office, mainly common-fast in Takamatsu district
With a focus on investment, it is playing an active part is put in Okayama rode the train.
( This is a machine translation. Please allow for possible misinterpretations in the text. )