Product Description
- I'll Shinkansen trains the same six real!
- Kyushu Shinkansen:
Kyushu Shinkansen has opened a new section between Yatsushiro - Kagoshima in 2004.
In 2011 while Hakata to Shin Yatsushiro, the whole line was opened.
Kyushu Shinkansen bullet train is running in the [swallow] [Sakura] [Mizuho] has,
Connected by the fastest 19 minutes to an hour from Fukuoka Kagoshima.
- New 800 series Shinkansen:
The new 800 series Shinkansen (U007-U009) was introduced in 2009.
Initially, [swallow] were not operated as, in the Kyushu Shinkansen from March 12, 2011
[Sakura] [swallow] has been operated as a. Was drawn to the body before and after the revision timetable
[Swallows] design changes have been made and will also be removed logo. In addition, the system 800 of Kyushu
Has been used in the shuttle in a bullet train.
( This is a machine translation. Please allow for possible misinterpretations in the text. )
Copyright Kyushu Railway Company
Requires 1 R06(`AA`Size) battery(Not included).
Item Size/Weight : 41 x 15 x 4.5 cm / 550g
Product Specifications
- Item code
- 430704
- JAN code
- 4904810430704
Purchase Information
This item is limited to 3 per household.