Product Description
-In July 2007, the N700 series that appeared spectacularly as the ultimate Shinkansen.
-Introducing new technology in the manufacturing stage, advanced technology introduced into the vehicle and comfort. In addition, the history of speeding up the railway from Kodama until the appearance of the N700 series.
-Introduce trailer transportation, shipping and draining patterns for N700 series transportation.
-In addition, the front view video boasts a maximum speed of 300km / h.
――― From DISC-1 development to a spectacular debut ―――
[Tokaido / Sanyo Shinkansen Dream Trail]
-The dream of speeding up Japanese railway continues from Kodama, which appeared in 1958.
-The history from the prototype train of the Shinkansen to the birth of the 0 series, the appearance of the expected Shinkansen N700 series pre-production prototype car Z0, along with Mr. Satoshi Kubo's commentary, will be traced with a number of valuable documentary images and photos.
[Development of new-generation Shinkansen N700 series]
-N700 series contains many new technologies.
-Introducing the points and excellent technology of N700 series development with interviews with development staff of JR Tokai / JR West.
[More comfortable and higher quality N700 series interior space and equipment]
-Inside the car, there are lights, colors, various information displays, decks, seats, toilets, and every corner of the bathroom.
-Introducing functional and beautifully finished interior spaces and equipment.
[Birth of mass-produced car N700 series manufacturing process]
-Shinkansen manufacturing technology has made remarkable progress compared to the 700 series.
-Introducing the manufacturing process from the processing to the completion of the material, mainly with the new manufacturing technology at Japan Vehicle Toyokawa Manufacturing, with images of the material and parts manufacturers.
[Transportation of Z1 train from Japanese vehicle to JR Tokai Hamamatsu factory]
-Two 16-car Z1 trains for JR Tokai were transported from Nippon Toyokawa Manufacturing Co., Ltd. to the JR Tokai Hamamatsu Plant over a period of 8 days.
-Introducing for the first time the trailer transportation that goes through National Route 1 at midnight and the interesting restoration scenery at the Hamamatsu Factory.
[Transport of N3 trains From Japanese rolling stock to JR West Hakata Sogosha]
-The JR N3 train for West Japan was shipped from Toyohashi Port to Hakata Port.
-Scenes that are spectacular such as scenery from shipping to draining, midnight, transportation through the city of Hakata, restored scenery at the Hakata General Vehicle Depot.
[Dream is reality] From public release to debut]
-JR press release and Z3 formation test run report, parent and child test ride, July 1, 2007, departure ceremony in Shinagawa, Shin-Osaka, Hakata, many running scenes on the Tokaido / Sanyo Shinkansen after the start of commercial operation Recording.
――― DISC-2 N700 series Z1 formation Nozomi No. 26 Front view ―――
[Hakata General Rolling Stock Office-Hakata-Shin Kobe]
-The powerful image seen from the cab of the Shinkansen running at 300 km / h is a masterpiece.
-It also contains scenes from the inspection warehouse and patterns of incoming lines that you can not usually see. Taken on August 21, 2007
-90 minutes + 145 minutes [2 DVD set]
( This is a machine translation. Please allow for possible misinterpretations in the text. )
This item is recorded in Japanese.
Item Size/Weight : 19 x 13.5 x 1.4 cm / 150g
- *Please note that the book's paper strip may not be included. Additionally, we do not offer replacements for any damage or wear to the strip.
Product Specifications
- Item code
- DW-4841
- ISBN code
- 4932323484129
Purchase Information
This item is limited to 4 per household.