Product Description
- The Hokuriku Main Line will undergo a major transformation with the opening of the Hokuriku Shinkansen extension to Tsuruga on March 16, 2024.
- The Tsuruga-Kanazawa section was transferred from JR West to third-sector companies, and the operating area of the Thunderbird and Shirasagi express trains was reduced to south of Tsuruga.
- The express trains [Dynastar] and [Ohayo Express] will also be discontinued.
- Most of the 521 series trains used on local trains were transferred to the new company.
- This film follows the section of the Hokuriku Main Line, passing through the final section between Kanazawa and Tsuruga as part of JR's line, and all the way to Maibara, with footage of these trains in motion, while showcasing the line and each station in high-definition 4K footage, including the abandoned tracks of the old line that was abolished due to electrification.
- It also includes photos of the Hokuriku Shinkansen after its opening, as well as the remaining sections of the Hokuriku Main Line as we welcome the new spring.
- Audio: Linear PCM stereo/2 audio
1. Local sounds + narration + BGM
2. Local sounds only
- Recording time: 115 minutes (planned)
- Narrator: Hideki Hanekawa
( This is a machine translation. Please allow for possible misinterpretations in the text. )
This item is recorded in Japanese.
[ Related Products ]
- DVD Hokuriku Main Line 2 Eternity
- *Please note that the book's paper strip may not be included. Additionally, we do not offer replacements for any damage or wear to the strip.
Product Specifications
- Item code
- VB-6260
- ISBN code
- 4932323626031
Purchase Information
This item is limited to 4 per household.