Product Description
- Put four points in Linz and Vienna, Austria [Purassa & Toira] Inc. 1953
Founded in the year, with alertness to user needs and its high technology, machine-made maintenance of railway track
It is said that a leading manufacturer of work and sales. To date, 10,000 units in 100 countries around the world
The company's products to be delivered the inspection and maintenance machinery in excess of, the introduced (for railway maintenance machine), day
You can see up to small and medium-sized private railway to start the JR Shinkansen and groups in this country.
Is either the last train that ended the operation: this multiple Titan Per (aka Marutai) among the
During the first train to Luo, and pull up the sleepers who had sunk under the weight of the train, the ballast underneath
Is responsible for working to put the thrust (gravel) to repair successfully maneuver distorted. In the past, the human power in
It was the hard work of the heart, but it is maintenance vehicle an excellent were dramatically reduce it. Normal daytime section of track
Figure resting in a corner of is observed, a sense, an essential item to reproduce the modern railway
I will say that.
- Paint Color: Yellow
( This is a machine translation. Please allow for possible misinterpretations in the text. )
*Package is damaged but there is no problem on the item itself.
The article of this place has little stock. When it was a sellout, please forgive it.
[ Recommeded Items ]
See 3-flg. Flachwagonset mit Ladegut (Plasser & Theurer Flat Wagon for Maintenance of Tracks) (3-Car Set) (Model Train) also.
Item Size/Weight : 19.2 x 4.3 x 2.8 cm / 115g
Product Specifications
- Item code
- 5123501
- JAN code
- 4260104915402
Purchase Information
This item is limited to 1 per household.