This item is limited to 3 per household.
- Ecology railway container! 31 ft · U47A
[Vehicle Description]
- The Job 100 system to speed container trains, mass production to have been started in 1988.
International maritime container in a standard can be stacked group fully operational in one car unit, Job 106 20ft,
In addition to Tightened device corresponding to the 40ft container is standard equipment, so as to correspond to the product 24t marine container
Strengthen the underframe, shape has changed.
- I've been using a large container of 30 feet Nippon Express from March 1998, but this
Volume of the container is slightly smaller than 10t track, it had become an obstacle to the improvement of transport efficiency.
For this reason, can be stacked 31 feet container has been developed luggage equivalent to 10t track. This
The entire side opens upward in order to maximize the cargo handling efficiency is 31 feet container
It is a Full wing] expression uses hydraulic pressure to power the track to open and close the large side panel
There are. 31 ft container this new model is named [Eco liner 31], the entire group is currently
Container in excess of 200 pieces has been active throughout the country.
[Product Description]
- Container cargo is removable
- Can travel unladen state
- U47A container cargo number 16 all different
- Print on yellow 106 bar disconnect Job
※ locomotive is required separately to run
[Knitting diagram]
Job 106-843 + + Job Job 106-94 106-713 106-684 + + Job Job Job 106-511 + 106-120 +
Job Job 106-391 + 106-870
[Accessories]
- Reflective plate
( This is a machine translation. Please allow for possible misinterpretations in the text. )